Build steps (demo)
All steps
6 of 76 steps complete · 8%
Section 1Getting started6 of 7 done · ~41 hr total
- Set up the workshop~20 hr●●○○○
- Unpack and inventory~10 hr●●○○○
- Remove the body~2 hr●●○○○
- Remove and label the aluminum~5 hr●●○○○
- Prep the frame~4 hr●●○○○
Section 2Front suspension0 of 9 done · ~13 hr total
- Install the steering rack~1 hr●●○○○
- Install the lower control arms~1 hr 30 min●●●○○
- Install the upper control arms~2 hr●●●○○
- Assemble and mount the front coil-overs~2 hr●●●○○
- Install the spindles~1 hr 30 min●●●○○
- Install hubs and rotors~1 hr●●○○○
- Connect the tie rods~1 hr●●○○○
- Install the front calipers~1 hr 30 min●●●○○
- Optional: front sway bar~1 hr 30 min●●●○○
Section 3Rear suspension0 of 5 done · ~10 hr total
- Fit the toe arms and lower control arms~1 hr 30 min●●●○○
- Fit the upper control arms~1 hr●●●○○
- Mount the rear coil-overs~1 hr 30 min●●●○○
Section 4E-brake and fuel0 of 3 done · ~8 hr 30 min total
- Build and mount the e-brake~2 hr●●●○○
- Prep and install the fuel tank~3 hr●●●○○
- Filter and fuel lines~3 hr 30 min●●●○○
Section 5Pedals and steering0 of 5 done · ~11 hr total
- Prep and install the pedal box~2 hr 30 min●●●○○
- Master cylinders and balance bar~2 hr●●●○○
- Accelerator pedal~1 hr●●○○○
- Steering shaft and footbox front~3 hr 30 min●●●●○
- Upper column and turn-signal switch~2 hr●●●○○
Section 6Cockpit aluminum0 of 4 done · ~39 hr total
- Riveting rules●●○○○
- Fit, drill and cleco the cockpit~25 hr●●●○○
Section 7Brake system0 of 4 done · ~12 hr total
- Brake reservoir~1 hr●●○○○
- Front flex hoses~1 hr●●○○○
- Run the hard lines~8 hr●●●●○
- Fill and bleed~2 hr●●●○○
Section 8Wiring0 of 2 done · ~30 hr total
- Chassis harness and fuse panel~25 hr●●●●○
- Trunk aluminum~5 hr●●●○○
Section 9Engine and transmission0 of 4 done · ~15 hr total
- Dress the engine~5 hr●●●○○
- Lower in the engine and transmission~5 hr●●●●○
- Battery tray and cable~1 hr 30 min●●○○○
- Headers, fuel feed and throttle~3 hr 30 min●●●○○
Section 10Cooling0 of 2 done · ~5 hr total
- Fan and radiator~2 hr●●○○○
- Hoses, overflow tank and fan control~3 hr●●●○○
Section 11Driveline and tunnel0 of 2 done · ~8 hr 30 min total
- Speedometer sender and driveshaft~1 hr 30 min●●○○○
- Tunnel and remaining aluminum~7 hr●●●○○
Section 12Go-kart stage0 of 5 done · ~15 hr total
- Mount wheels and tires~1 hr●●○○○
- Seats, belts and steering wheel~3 hr●●○○○
- Fit and drill the roll bar~2 hr●●●○○
- Fluids, grease and rattle patrol~5 hr●●●○○
- First start and go-kart drive~4 hr●●●○○
Section 13Body fitting0 of 7 done · ~41 hr total
- Prep the frame for the body~2 hr●●○○○
- Mount and center the body~8 hr●●●●○
- Fit the hood and scoop~8 hr●●●●○
- Windshield and inside mirror~3 hr●●●○○
- Hang and gap the doors~10 hr●●●●○
- Trunk lid and latch~3 hr●●●○○
- Cut the body openings~7 hr●●●○○
Section 14Paint0 of 2 done · ~10 hr total
- Final prep and body off~10 hr●●●○○
- Paint and stripes●●●●○
Section 15Interior (body at paint)0 of 3 done · ~25 hr total
- Heat and sound insulation~8 hr●●○○○
- Carpet~13 hr●●●○○
- Seats, harnesses and boots~4 hr●●○○○
Section 16Final assembly0 of 6 done · ~38 hr total
- Pre-mount parts on the painted body~4 hr●●○○○
- Mount the painted body~8 hr●●●●○
- Hood, roll bar, glass and doors~12 hr●●●○○
- Dash and gauges~7 hr●●●○○
- Light wiring and trim~4 hr●●●○○
- Steering wheel center and side exhaust~3 hr●●●○○
Section 17Road ready0 of 6 done · ~10 hr total
- Ride height and corner balance~3 hr●●●○○
- Alignment and headlight aim~2 hr●●●○○
- Brake test and pad bedding~1 hr●●○○○
- Nut-and-bolt check~4 hr●●○○○