You're in demo mode — nothing you do here is saved.

Sign up free →

Written manual

The whole build, start to finish

Independent builder’s companion. Not produced, reviewed or endorsed by Factory Five Racing. 3D models are simplified illustrations, not CAD-accurate. Always follow the current official manual and component instructions; when this guide and the manual disagree, the manual wins.

76 steps in 17 chapters

Chapter 1

Getting started

Shop, tools, inventory, and stripping the as-shipped kit down to a bare frame.

Step 1: What you’re building

Rotate in 3D →

Instructions

  1. This guide follows the order of the official Mk5 manual: chassis assembly first (suspension, brakes, fuel, pedals, aluminum, wiring, drivetrain, cooling), then a rolling-chassis “go-kart” check, then the body, paint and final assembly.
  2. Each step shows the parts it adds in color and fades the parts already installed. Drag to orbit, scroll or pinch to zoom, and right-drag or drag with two fingers to pan. Click or tap any part to open it in the parts catalog.
  3. Use the parts callout in the corner of each step the way you would a Lego bag: gather exactly those pieces and fasteners before you pick up a tool.

Builder tips

  • Download the newest manual revision before you start and check it again during the build. Rev 1P added an IRS offset-bushing step that earlier copies lacked, and Rev 1O changed the battery tray.
  • Factory Five estimates about 300 hours for a mechanically complete car (Mk4 figure). Builders report anywhere from six months to several years of calendar time.

Step 2: Set up the workshop

⏱ 15–25 hEasy
Rotate in 3D →

Parts for this step

Instructions

  1. A one-car garage works. Plan floor space for the chassis plus the body on a buck, and a separate room or shelving for 30+ numbered boxes.
  2. Build a flat dolly before delivery. The Mk5 frame is flat-bottomed, so Mk4-style dollies that cradle round tubes will not fit; a 40 × 60" deck of stacked 4×4s on 2×6s works well.
  3. Use 8" or larger locking casters. Weight shifts rearward as the suspension and axle go on.
  4. Get good light over the frame and a rolling creeper. A lift is optional; QuickJack 5000TL/6000TL units fit between the Mk5’s wheels.

⚠ Caution

  • Never work under the frame on a floor jack alone. Use stands or cribbing, including under a QuickJack.

Builder tips

  • Have four rated jack stands on hand for delivery day if the dolly is not ready.
  • Liability and agreed-value build insurance can start now. Homeowner’s coverage may cap “contents” at a few hundred dollars.

Tools

  • Jack stands, creeper, lighting

Step 3: Gather tools and supplies

Easy
Rotate in 3D →

Instructions

  1. Manual tool list (p.17): rivet tool with 1/8" and 3/16" heads; drill bits 3/32, 1/8, 9/64, 3/16, 7/32, 5/16, 7/16 and 1/2"; 7/8", 1-1/4" and 2-1/4" hole saws; 1/4" and 5/16" line benders; 3/8"-drive click torque wrench; engine hoist with 6' of 5/16" chain; jig saw.
  2. Helpful: 3/8" and 7/16" flare-nut wrenches and a Chrysler-type upper ball-joint socket (Sunex SXT-10213).
  3. Supplies (p.18): GE Silicone II (4 tubes), blue Loctite, 2 gal coolant concentrate, 5–8 qt oil, 2 qt 80W-90, 1 qt DOT 3, 3M Super 77 (4 large cans), tapes, acetone, aluminum polish.
  4. See the Tools tab for the full list builders recommend, including clecos, #30 bits and a quality flaring tool.

Builder tips

  • Buy a 10-pack of #30 bits for 1/8" rivets and hardened 1/8" bits for drilling into steel.
  • A Scotch-Brite wheel on a cheap bench grinder is the deburring tool you’ll use most.

Step 4: Unpack and inventory

⏱ 8–12 hEasy📖 Manual p.26
Rotate in 3D →

Parts for this step

Instructions

  1. The chassis arrives with the body, doors, hood, trunk lid and many aluminum panels mounted for shipping. Boxes are numbered in order of use.
  2. Inventory every box against its packing list and report shortages within 45 days. Work one box at a time and write the major contents on the outside.
  3. Expect a Parts-On-Order (POL) list. Commonly back-ordered on 2025–26 Mk5s: roll bars, Box 24 fuel-tank parts, harness, driveshaft and steering wheel.
  4. Lay the carpet and dash flat. Unbox the hood scoop right away so it can’t deform under other boxes.
  5. Paint or coat bare-steel parts early: 3-link upper axle mount, side-exhaust plates, door-latch spacers, quick jacks and side pipes.

Builder tips

  • Scan the packing lists into a searchable PDF or spreadsheet. The fastener-pack list is Appendix H at the back of the manual.
  • Measure long parts during inventory. One Mk5 builder found Coupe-length steering-shaft links only when they wouldn’t fit.
  • Check small bags before reporting a shortage; stamped nuts and Belleville washers hide well.

Step 5: Remove the body

⏱ 2 hEasy📖 Manual pp.27–29
Rotate in 3D →

Instructions

  1. You need a 5/8" socket and wrench and at least two helpers (three is better). Wear gloves: raw fiberglass edges splinter.
  2. Unbolt the doors from the hinges (leave the hinges on the chassis) and cut the zip ties at the latch area.
  3. Remove the hood, unbolt the trunk lid, then the underside body bolts, the rear quick jacks and the nose screws under the oil-cooler opening.
  4. Lift the body straight up and set it on a buck.

⚠ Caution

  • A body stored flat on the ground can bow forward of the doors. Support it with two 24" vertical 2×4s under the windshield-post holes or build the buck in Appendix A.

Builder tips

  • Store the body outside on its buck if space is short; FFR stores bodies outdoors.

Step 6: Remove and label the aluminum

⏱ 4–6 hEasy📖 Manual pp.30–34
Rotate in 3D →

Parts for this step

Instructions

  1. Remove panels one at a time. Before each comes off, trace where it contacts the frame on its back side with a marker. That line becomes your rivet line.
  2. Label every panel and photograph the overlaps from several angles. Marker marks disappear under powder coat.
  3. Keep the #8 shipping screws; they locate the panels again later.
  4. Set the bare frame on jack stands or the dolly.

Builder tips

  • Shipping-screw holes are only a starting point. The passenger outer footbox panel in particular may not line up.
  • If you plan to powder coat the panels, fit, drill and cleco them all first.

Step 7: Prep the frame

⏱ 3–5 hEasy
Rotate in 3D →

Instructions

  1. Clear powder coat out of bolt holes and chase the floating nuts with a tap (the rear quick-jack nuts are 7/16-14).
  2. Spread brackets that are tight with threaded rod and nuts. Never hammer forged arms into a bracket.
  3. Find and photograph the chassis serial number on the 1.5" cross tube at the front of the driver-side cockpit. It must match your Certificate of Origin.
  4. Plan routing before any panel goes on: fuel down the right side, brakes down the left, harness along the top tubes. Nothing may hang below the frame bottom.

Builder tips

  • Mock up the “fixed” items first (suspension, tank, radiator, pedal box, engine). Then route the flexible items around them (lines, harness, reservoirs).

Chapter 2

Front suspension

Rack, control arms, coil-overs, spindles, hubs and brakes.

Step 8: Install the steering rack

⏱ 1 hEasy📖 Manual pp.36–43
Rotate in 3D →

Parts for this step

Instructions

  1. FFR rack: press in the poly bushings and the 2.45" spacers. (Mustang power racks: remove the factory rubber bushings first and fit the inner tie-rod extensions with threadlocker.)
  2. Lower the rack in, right side first.
  3. Mount it in the lower holes for street ride height. The upper holes are for race height.
  4. Insert the 1/2" × 4" grade-8 bolts from back to front with washers and locknuts, and tighten fully.

Torque

Rack mount bolts (1/2-13)“Fully tighten”; general chart 75 lb-ft

Builder tips

  • A converted Mustang power rack must stay vented. A plug is fine only if it has a vent hole.

Tools

  • Sockets and wrenches
  • Torque wrenches

Step 9: Install the lower control arms

⏱ 1.5 hModerate📖 Manual pp.44–47
Rotate in 3D →

Parts for this step

Instructions

  1. Install the grease fittings and pump grease until it purges at the bushing flutes. Give the pre-greased ball joints a few pumps.
  2. Before mounting, swap the rear-pivot zerk for a 90° fitting pointing down; the frame blocks a straight one.
  3. Mount each arm in the lower chassis holes with the bolts inserted from the inside out. Large washers take up the wide rear mount (it’s sized for OEM arms); put one on each side of the rear leg.
  4. Hold each arm parallel to the ground and torque.

Torque

LCA pivot bolts to frame100–110 lb-ft (arm level)

⚠ Caution

  • Torque with the arm level, not hanging at full droop, or the bushings will be preloaded at ride height.

Builder tips

  • Some early Mk5 kits had LCA bolts too short for the forged arms. Check thread engagement past the nut.

Tools

  • Torque wrenches
  • Grease gun

Step 10: Install the upper control arms

⏱ 2 hModerate📖 Manual pp.47–52
Rotate in 3D →

Parts for this step

Instructions

  1. Ball joint: threadlocker on the threads. Screw it in so the joint angles outward at the bottom, holding the joint in a vise and using the arm as leverage. Fit the zerk after.
  2. The left arm’s ball-joint plate has its solid side facing forward. Zerks point up; the welded piece faces forward on the driver side and rearward on the passenger side.
  3. Bolt the cross shaft to the frame with the pivot bolts going in from the top, nuts on the bottom.
  4. Endplay: tighten the pivot-shaft end nuts until endplay is minimal but the arm still rotates freely. If the pivots won’t take grease, endplay is too tight.
  5. Length adjustment comes later at alignment: loosen the 3 pivot bolts and the 1-1/8" jam nuts, turn the sleeves, retighten.

Torque

Upper ball joint into arm125 lb-ft with ball-joint socket
Cross shaft to frame80–85 lb-ft
UCA pivot bolts54 lb-ft (alignment page says 60)

⚠ Caution

  • Never leave more than 1" of thread showing past a jam nut.

Builder tips

  • Kit Mevotech joints sometimes won’t thread in. Howe 22320S or Moog are the usual substitutes.
  • Ignore the “R model” diagram unless you are building an R. It uses 0.84" spacers and 1/2" × 2.75" bolts.
  • Replace the thin blue upper boots with Energy Suspension 5.13102G; stock boots can tear within 500 miles. Stop greasing when a boot swells.

Tools

  • Torque wrenches
  • Ball-joint socket
  • Bench vise

Step 11: Assemble and mount the front coil-overs

⏱ 2 hModerate📖 Manual pp.52–60
Rotate in 3D →

Parts for this step

Instructions

  1. Check the jam nut under the rod end. Thread the spring seat toward the unthreaded end of the sleeve, then slide the sleeve on unthreaded end first so it seats on the shock-body snap ring.
  2. Grease one face of the Delrin washer and install it grease-side down. Slide the bump rubber about 2" down the shaft.
  3. Fit the spring and hat, run the seat up until the hat is tight, fit the snap ring with its slot offset from the hat slot, and zip-tie the spring to the hat.
  4. Lower mount: 0.40" + 0.50" spacers and a 1/2" × 3.25" bolt, inserted front to back. Top mount: 0.675" spacers.
  5. Red KONIs use the lower top-mount holes for street (upper for race). Silver double-adjustables have their own rules; check the manual.

Torque

Coil-over upper and lower bolts40 lb-ft

Builder tips

  • Set the spring collars to just touch the springs for now. Ride height gets set at the end with the car fully loaded.

Tools

  • Torque wrenches

Step 12: Install the spindles

⏱ 1.5 hModerate📖 Manual pp.66–69
Rotate in 3D →

Parts for this step

Instructions

  1. The spindle marked DSS goes on the right; PSS goes on the left.
  2. Lower ball joint: fit the 15803 countersunk spacer (taper facing down) under the castle nut, torque, then install the cotter pin.
  3. Upper ball joint: torque the castle nut and fit the cotter pin. A boot that looks crushed with the arm in the air is normal.

Torque

Lower ball joint castle nut80–90 lb-ft
Upper ball joint castle nut75 lb-ft

Builder tips

  • Castle nuts seat a taper. Torque to spec, then advance only to the next slot for the cotter. Over-torquing has stripped ball-joint and tie-rod threads.
  • Mk5 lower ball joints are Fox-era Mustang press-in parts, about $30 at a parts store if you ever need one.

Tools

  • Torque wrenches
  • Crowfoot wrenches

Step 13: Install hubs and rotors

⏱ 1 hEasy📖 Manual p.69
Rotate in 3D →

Parts for this step

Instructions

  1. Tap each hub onto its spindle and torque the hub nut.
  2. Drive on the dust cap.
  3. Clean the rotor with brake cleaner and hold it on with two lug nuts while you fit the caliper.

Torque

Front hub nut225–250 lb-ft

Tools

  • Torque wrenches

Step 14: Connect the tie rods

⏱ 1 hEasy📖 Manual pp.70–72
Rotate in 3D →

Parts for this step

Instructions

  1. Thread the jam nut and outer tie-rod end 1–2" onto each inner rod.
  2. Rough-set the toe: 53-1/16" center to center between the tops of the outer tie-rod-end studs, with equal thread showing on each side.
  3. Tie-rod end mounts to the steering arm from below. Torque the castle nut and fit the cotter pin.

Torque

Tie-rod end castle nut25 lb-ft + cotter
Tie-rod end nylock version59 lb-ft
Steering arm to spindle60 lb-ft

Builder tips

  • Bump steer is not covered in the manual. Builders report the Mk4/Mk5 geometry has little; measure before buying a kit. Target 0.005–0.015" toe-out on bump, never toe-in.

Tools

  • Torque wrenches

Step 15: Install the front calipers

⏱ 1.5 hModerate📖 Manual pp.73–81
Rotate in 3D →

Parts for this step

Instructions

  1. Torque the slider pins and fit their boots.
  2. Fit the 6 pad clips: the 4 end clips with the long tab out, the 2 center clips with the tab up through the center hole.
  3. Grease the slide pins, fit the hanger and seat the boots over the bracket lip.
  4. Pads: inner pads have their studs near the ends; outer pads near the middle.
  5. Mount each caliper with the bleeder on top using the M12 × 35 12-point bolts.

Torque

Caliper slider pins23–26 lb-ft
Caliper to spindle (M12 12-pt)95 lb-ft

⚠ Caution

  • Bleeder must face up or you will never get the air out.

Tools

  • Torque wrenches

Step 16: Optional: front sway bar

⏱ 1.5 hModerateOptional📖 Manual pp.61–65
Rotate in 3D →

Parts for this step

Instructions

  1. Requires FFR lower control arms. The bar runs under the rack. Swap the lower shock bolt for a 1/2" × 4" bolt.
  2. Start in the 2nd hole from the end of the bar; move to the 3rd if there’s too much body roll.
  3. Unscrew the rod ends so the bolts pass without preload. Lift the suspension to about ride height before fitting the end links.

Torque

End-link lower bolts40 lb-ft

Builder tips

  • The bar ends can hit the rims at full lock. Re-center the bar and clamp split collars so it can’t walk.

Chapter 3

Rear suspension

2015 Mustang-based IRS: center section, toe, lower and upper arms, CV axles, spindles and coil-overs.

Step 17: Prep the spindles and hang the center section

⏱ 3 hModerate📖 FFR 2015 IRS instructions (33658 Rev C); Mk5 manual pp.104–141
Rotate in 3D →

Parts for this step

Instructions

  1. Parts come from a 2015-or-newer Mustang: the Super 8.8 center section, both spindles and the rear brakes (or FFR’s 16668 package).
  2. Spindles: remove the calipers if they’re mounted, then drill out the tapered hole at the top of each spindle with a 5/8" bit for the upper-arm bolt.
  3. Lay rags over the front center-section mount. With a helper, lift the center section nose-up into the frame and over the front mount, level it, back it up above the mounts and lower it so the bolts go in.
  4. Shorter bolts go in the rear mounts; the longer bolts and nuts in the front.

Torque

Center section to frame, front and rear129 lb-ft (175 Nm) per the torque chart; the step text says 100 lb-ft, so check your revision

Builder tips

  • The center section weighs about 93 lb (steel housing). Get a helper.

Tools

  • Torque wrenches
  • #30 drill bits

Step 18: Fit the toe arms and lower control arms

⏱ 1.5 hModerate📖 FFR 2015 IRS instructions (33658 Rev C); Mk5 manual pp.104–141
Rotate in 3D →

Parts for this step

Instructions

  1. Toe arms: bolt each to the frame below the front lower-arm mount with a 5/8" × 2.25" bolt, the 1/8" spacer behind the rod end and the 1/4" spacer in front.
  2. With the sway-bar option, pass the toe-arm bolt through the bar’s frame bracket now.
  3. Lower arms: shock mount toward the rear, spindle brackets up, M16 × 110 mm bolts. Hold each arm horizontal while you torque.

Torque

Toe arm to frame100 lb-ft (135 Nm)
Lower arm to frame100 lb-ft (135 Nm)

Tools

  • Torque wrenches

Step 20: Install the CV axles, spindles and brakes

⏱ 3 hModerate📖 FFR 2015 IRS instructions (33658 Rev C); Mk5 manual pp.104–141
Rotate in 3D →

Parts for this step

Instructions

  1. The inner CV joints differ left to right. Push each into the center section until about 1/8" (3 mm) is left between joint and housing; if needed, thread the nut on and tap the axle in with a plastic mallet, then pull to check it’s locked.
  2. Slide the spindle onto the outer joint and start the axle nut.
  3. Lower arm to spindle: M16 × 90 mm bolt and locknut. Upper arm: angled adapter into the rod end, 5/8" × 3.5" bolt. Toe arm: M14 × 80 mm bolt. Torque them once all three are in.
  4. Brakes: follow the IRS brake kit’s instructions with the bleeder on top. Connect the hose with the suspension at full droop so it keeps slack, then run the hard line to its frame mount.

Torque

Lower, upper and toe arm to spindle100 lb-ft (135 Nm)
Hub to spindle98 lb-ft (133 Nm)
CV axle nut98 lb-ft (133 Nm), then 45° more
Caliper bracket to spindle129 lb-ft (175 Nm)
Caliper to bracket24 lb-ft (32 Nm)
Brake hose banjo bolt29 lb-ft (39 Nm)

Tools

  • Torque wrenches

Step 21: Mount the rear coil-overs

⏱ 1.5 hModerate📖 FFR 2015 IRS instructions (33658 Rev C); Mk5 manual pp.104–141
Rotate in 3D →

Parts for this step

Instructions

  1. Roadster IRS springs are 400 lb/in. Assemble the coil-overs like the fronts: sleeve over the body, spring and hat on, snap ring in with its slot away from the hat’s slot.
  2. Top: rod end to the upper shock mount with the two 1.09" spacers.
  3. Jack the spindle up and bolt the body end to the lower-arm mount: the 1.09" spacer behind, the 7/16" spacer in front.

Torque

Coil-over bolts, top and bottom40 lb-ft (54 Nm)

Builder tips

  • Alignment: camber −0.5° to −0.75°, total toe 1/8" in.
  • Fluids: SAE 75W-85 synthetic hypoid, 3.15–3.30 pt, plus 3.0–3.5 oz of XL-3 friction modifier.

Chapter 4

E-brake and fuel

Tunnel e-brake, tank, pump, filter and lines.

Step 22: Build and mount the e-brake

⏱ 2 hModerate📖 Manual pp.142–165
Rotate in 3D →

Parts for this step

Instructions

  1. Handle (Rev C, 29 parts): nylon bushings into the fixed gear and handle support. Stack on the shoulder bolt: handle mount, fixed gear, ratchet support, mount, handle support. Tighten the 5/16" nut until the plates touch but still move.
  2. Fit the ratchet tooth on the 10" anchor rod with its spring pin and the 1" nylon spacer (add the 1/2" spacer for more preload). Add the upper handle, spring and button.
  3. Bolt it to the tunnel tabs with 5/16" × 0.75" bolts.
  4. Cables: click the sheaths into the tunnel bracket. IRS: run each cable over the center section and its rear mount, then down and over to the caliper, and under the 4" crossmember to the handle.

Builder tips

  • With Wilwood rear calipers the cables can run short. One Mk5 builder used the spacer brackets from the older Mk4 manual and trimmed about 1/8" off the crimped cable ends.

Step 23: Prep and install the fuel tank

⏱ 3 hModerate📖 Manual pp.166–182
Rotate in 3D →

Parts for this step

Instructions

  1. Push 1" square plastic caps into the open tubes ahead of the tank.
  2. Vent: screw it into its bushing (7/8"), fit the small grommet, push it in.
  3. Pickup and sender: use the round-profile O-ring, rotate the pickup into the sump and tap the lock ring until all 3 tabs hold. For high-power EFI, discard the rubber piece on the return tube.
  4. Filler neck: fit the gasket, lubricate it and slide the tube in; drill a 1/4" hole for the retainer outside the seam weld.
  5. Flatten the tank flange at the straps, set the tank in its plastic cover and raise it with a jack. The longer strap goes on the right. Tighten only the left strap; the right comes off later to fit the trunk aluminum.

Builder tips

  • Replace the kit filler-neck-to-tank seal with Ford F4ZZ-9072-DA. The kit seal leaked for one builder; the Ford part has held for years.
  • Install the filler neck before the tank is fully strapped in.
  • Strap holes may be undersized for the 3/8" bolts; open them up.
  • The fuel pump is not in the kit. Coyote control packs require a return-style system, and Ford prefers an in-tank pump.

Step 24: Filter and fuel lines

⏱ 3–4 hModerate📖 Manual pp.182–191, 303
Rotate in 3D →

Parts for this step

Instructions

  1. Clamp the filter to its bracket and rivet the bracket to a frame tube with 3/16" rivets. The arrow shows flow.
  2. Route the supply line from the filter to mid-frame, then down the transmission tunnel. FFR runs fuel down the right side and brakes down the left.
  3. Join nylon connectors to hard line with short flex hose and EFI clamps. Leave slack at the engine.
  4. Vent hose: 25" of 5/16" hose to a charcoal canister, or loop it higher than the tank and tie it to the 3/4" tube.

⚠ Caution

  • Never run a line below the bottom of the frame. Keep lines away from headers and moving parts.

Builder tips

  • Kit lines are carb-sized (5/16" supply, 1/4" return). Coyote builds typically run -6AN PTFE supply and -6AN or -4AN return; Gen 3/4 control packs want 65 psi and at least 165–175 L/hr.
  • With an in-tank pump, use only a 10-micron filter after the pump. Fit an inertia switch.

Tools

  • Flaring tool
  • Rivet tool

Chapter 5

Pedals and steering

Pedal box, master cylinders, throttle and the steering column.

Step 25: Prep and install the pedal box

⏱ 2–3 hModerate📖 Manual pp.192–207
Rotate in 3D →

Parts for this step

Instructions

  1. Fit the pedal pads with a T-20 Torx, starting in the middle holes.
  2. Brake-light switch: drill 3/16" through the pedal box beside the pivot and mount it with the black #10 screw. The clutch safety switch mounts the same way.
  3. Set the box in: left side on top of the frame mount; right side on top of the front mount and under the rear mount.
  4. Fasten with four 5/16" button heads, leaving the rear-right one loose (it may need flipping for steering-shaft clearance). Fit top mount 60193 with 1/4" × 0.50" flange screws, then drill 1/4" through the 1" tube for 1/4" × 1.25" bolts.

Builder tips

  • Coyote: install Ford’s bottom-of-travel clutch switch (starter interlock). Set it so it is fully pressed at full pedal travel without stressing its body. Do not bypass it.

Tools

  • #30 drill bits
  • Hex keys

Step 26: Master cylinders and balance bar

⏱ 2 hModerate📖 Manual pp.206–209
Rotate in 3D →

Parts for this step

Instructions

  1. Bench-bleed both 3/4" master cylinders first.
  2. Cut 5/8" off each pushrod with the jam nut on.
  3. The 90° outlet adapter is NPT: point it up and don’t overtighten. Fit the inlet adapter and hose clamp.
  4. Left master = front brakes; right master = rear brakes. Start with each pushrod threaded flush through its mount.
  5. Balance bar: 0.20–0.25" total clevis-to-pedal gap at neutral. Pushrods must stay straight through full travel and fully return (piston against its snap ring).
  6. Hydraulic clutch: a third master cylinder goes on the clutch pedal (option 34158). Cable clutch: quadrant, cable and firewall adjuster.

Builder tips

  • The inboard master can hit the frame rail; seat it low and bend the tabs.
  • No proportioning valve is used: the dual masters and balance bar set front/rear bias.

Step 27: Accelerator pedal

⏱ 1 hEasy📖 Manual pp.210–217
Rotate in 3D →

Instructions

  1. Carb/cable engines: cut the barrel off the cable and fit the ball-stud retainer (5/64" hex). The kit pedal’s cable attachment sits 1.50" from the footbox.
  2. Coyote: use Ford’s drive-by-wire pedal on FFR’s accelerator mount. Check fit before flipping or cutting anything; builders found the original orientation worked better.

Builder tips

  • Don’t powder coat the supplied Coyote accelerator bracket; the Mk5 has a welded mount.
  • Set the throttle pad so heel-toe works: the brake, when pressed, should sit level with the throttle.

Step 28: Steering shaft and footbox front

⏱ 3–4 hInvolved📖 Manual pp.218–237
Rotate in 3D →

Parts for this step

Instructions

  1. Fit the driver footbox front aluminum with the 3/4" flange bearing: silicone everything except the inside vertical tube. Clamp it and locate it with the bearing; don’t rivet yet.
  2. Bearings: top 3/4" pillow block (set screw rearward); footbox-front 3/4" flange bearing with both halves on the front face; middle 1" pillow block (set screw forward) on 3/8" × 1" button heads.
  3. U-joints: manual rack, align the set screw with the flat and tap it on. On the 1" DD tube, mark through the set-screw hole and drill a dimple (3/16" then 5/16").
  4. Every shaft sits flush with the inside of its joint. Use set screws plus jam nuts; threadlocker on any screw without a jam nut.
  5. The middle 3/4" shaft may need cutting to 12.50".

Builder tips

  • Also re-Loctite the button screws on the U-joint cross shafts.
  • Measure your shaft lengths at inventory. Some Mk5 kits shipped Coupe-length links.

Tools

  • Hex keys
  • #30 drill bits
  • Threadlocker

Step 29: Upper column and turn-signal switch

⏱ 2 hModerate📖 Manual pp.220–237
Rotate in 3D →

Parts for this step

Instructions

  1. Mount the turn-signal switch and column bracket to the top bearing mount; leave them loose.
  2. Center the rack. Set the cam just ahead of the switch springs, which should touch only the eared portion.
  3. Center the shaft in the switch with shim washers: under the top bearing, under the switch mount, or by moving the middle bearing.
  4. Collapse joint: both recesses facing up, set the Belleville washers, tap until the clip disappears.
  5. Dress the upper shaft with 400-grit and grease so it slides.

Builder tips

  • The Mk5 wheel sits high. One builder dropped the column mount about 3/8" with spacers, putting the wheel nearly 1" lower relative to the seat.

Chapter 6

Cockpit aluminum

Fit, drill and cleco every panel, then seal and rivet.

Step 30: Riveting rules

Easy📖 Manual p.218
Rotate in 3D →

Parts for this step

Instructions

  1. 1/8" rivets for all panels unless told otherwise: 3" spacing panel-to-frame, 2" panel-to-panel. The rivet-spacing tool centers holes on the 3/4" tubes when aligned to your marker line.
  2. 3/16" rivets for brackets, insulated clips, filter and flex-line brackets, hood pivots, check straps, and the radiator floor to the nose lip.
  3. Method: locate the panel with the #8 shipping screws, mark and drill 1/8" (a #30 bit), cleco every hole, then pull the panel, deburr, apply GE Silicone II to the frame and rivet.
  4. Tweak bends with a sheet-metal seamer. Never straighten and re-bend.

⚠ Caution

  • Avoid drilling into weld beads, and deburr every hole.

Builder tips

  • Rivet as late as you can. Floors and walls block access for brake, fuel and wiring work.
  • Never silicone service panels (footbox tops, tunnel tops, sender covers). Use rivnuts or tapped holes with anti-seize.
  • With a pneumatic gun, run low air pressure. Tip the gun back after each pull so silicone doesn’t jam it.
  • The Milwaukee M12 rivet tool is the builders’ favorite; keep a compact hand riveter for tight spots.

Step 31: Fit, drill and cleco the cockpit

⏱ 20–30 hModerate
Rotate in 3D →

Parts for this step

Instructions

  1. Hang each panel on its shipping screws, mark the rivet line from the inside using your traced line, drill and cleco every hole.
  2. Mk5 footbox fronts are heavily bent. Feed them in at an angle from the engine side, bottom first; they spring back. Wear gloves.
  3. The rear cockpit wall’s creases are hand-bent and can be over-bent. Push it in, cleco it, move on.
  4. Floor perimeter bends ship near 90° and usually want 75–80°.

Builder tips

  • Fit, drill and cleco everything before powder coating panels.
  • Rev 1Q has no firewall section. Experienced builders install the firewall first, Mk4-style.

Step 32: Seal and rivet the footboxes and firewall

⏱ 6–8 hModerate📖 Manual pp.238–244
Rotate in 3D →

Parts for this step

Instructions

  1. Right footbox: inside, front, then outside. (Hold off on the outside panel if you’re fitting A/C.)
  2. Left footbox: inside top and bottom, siliconed to the firewall. Leave the outside panel off.
  3. Run a continuous 1/8–3/16" bead of silicone on the frame, set the panel and rivet. Wipe squeeze-out while fresh.

Builder tips

  • Make the footbox tops removable with 10-32 rivnuts or tapped holes. You will need access later.
  • Use AN bulkhead fittings or grommets wherever lines pass through the footbox.

Tools

  • Rivet tool
  • GE Silicone II

Step 33: Seal and rivet floors, rear wall and under-door

⏱ 6–8 hModerate📖 Manual pp.244–250
Rotate in 3D →

Parts for this step

Instructions

  1. Lower rear wall first, leaving its top flange un-riveted.
  2. Floors: seal and rivet the horizontal surfaces first, then the tunnel wall.
  3. Under-door panels, then the rear outside lower corners (inside the floor and wall, outside the angled 1.5" × 3/4" tube).
  4. Upper corners, then the upper rear wall.

⚠ Caution

  • Most RTV releases acetic acid and won’t take paint. Keep silicone off anything you plan to paint or remove.

Chapter 7

Brake system

Reservoir, flex hoses, hard lines and bleeding.

Step 34: Brake reservoir

⏱ 1 hEasy📖 Manual pp.250–255
Rotate in 3D →

Instructions

  1. The reservoir must sit higher than the master cylinders. Mount it on the footbox front inside the hood opening with 1/4" holes.
  2. Hose through the wall: a bulkhead fitting in an oversized 1/2" hole, or a 5/8" hole with deburred edges.
  3. Use one reservoir split with a Y, or one per master. Put clamps on before pushing hoses onto barbs and keep the hoses clear of the pedals.

Builder tips

  • With a Coyote the space is tight, and the body can cover a reservoir on the forward 1.5" tube. Test-fit with the body on before you drill.
  • Separate reservoirs per circuit help you diagnose which circuit is leaking.

Step 35: Front flex hoses

⏱ 1 hEasy📖 Manual pp.256–262
Rotate in 3D →

Parts for this step

Instructions

  1. Pass the adapter through the laser-cut bracket and fit its clip. A crush washer goes on each side of the banjo.
  2. Clamp the bracket on the 1.50" tube above the LCA rear mount.
  3. Turn the steering lock to lock and check the hose is never taut, then rivet the bracket with two 3/16" rivets.

Torque

Front banjo bolt29 lb-ft

Builder tips

  • The upper F panels need relief cuts where the flex lines pass through.

Step 36: Run the hard lines

⏱ 6–10 hInvolved📖 Manual pp.262–279
Rotate in 3D →

Parts for this step

Instructions

  1. Front left: a 60" line from the left master, down the 1.50" tube and up the back of the angled suspension tube to the tee on the left flex hose.
  2. Front right: two 20" lines from the tee across the front of the engine to the right flex hose.
  3. Rear: a 60" line from the right master to the back of the inner footbox, down the tunnel’s 1" tubes, to the rear flex hose and tee (on the driver-side diagonal 3/4" tube for FFR brakes; 87–93 Mustang axles use a single center hose), then across.
  4. Clip every 12" or so with 1/4" insulated clips and 3/16" rivets. Silicone where lines enter the cockpit.

Torque

Rear banjo bolt32 lb-ft

⚠ Caution

  • Lines must never sit below the frame and must be kept away from headers, or heat-shielded.
  • Standard 3/16" lines use a 45° double (inverted) flare. Don’t mix 37° AN and 45° fittings, and never use aluminum fittings on brakes.

Builder tips

  • NiCopp flares easily; stainless needs a quality tool and annealing. The Eastwood flaring tool is the consensus pick; cheap tools are only good for copper/NiCopp.
  • Tighten a new flare, loosen it, then retighten to seat it.
  • Check the routing past the driver footbox against your headers. One builder’s line ended up 3/16" from a primary.

Tools

  • Flaring tool
  • Tube benders
  • Flare-nut wrenches

Step 37: Fill and bleed

⏱ 2 hModerate📖 Manual pp.280–281
Rotate in 3D →

Instructions

  1. Set the pedal temporarily high so the masters get full stroke.
  2. Fill the reservoir. Bench-bleed the masters in the car with short loop lines back to the reservoir, then reconnect.
  3. Gravity-bleed by cracking all four bleeders.
  4. Pump-bleed one front and one rear at the same time (the masters travel unequally). Tap the calipers to free bubbles.
  5. Finish with a final bleed of the right side: RR and RF.
  6. Pedal adjustment: brake higher than the throttle so that, pressed, it sits level with the throttle. Clutch about 2" above the brake (p.281; p.373 says 1/2", so set it to suit you).

Builder tips

  • A firm front but soft rear was traced to an out-of-round factory flare that pulled in air without leaking fluid. Isolate circuits by plugging master outlets.
  • Manual specifies DOT 3. DOT 4 is common; never DOT 5 silicone.

Tools

  • Brake bleeder

Chapter 8

Wiring

Chassis harness, fuse panel and trunk aluminum.

Step 38: Chassis harness and fuse panel

⏱ 20–30 hInvolved📖 Manual pp.282–283 + harness instructions
Rotate in 3D →

Parts for this step

Instructions

  1. Mount the fuse panel (11 fuses, 3 relays, 2 flashers; swap in the LED flashers). Ground the main harness to bare frame nearby.
  2. Front harness through the small right footbox-front hole, along the outside top 3/4" tube to the front.
  3. Rear harness along the driver-side top tunnel tube, then down the center rear 3/4" tubes. The “Y” belongs at the frame’s rear.
  4. Fix with insulated clips and 3/16" rivets.
  5. Mk5 specifics: plug the column turn-signal switch in near the fuse panel, cut and tape the pink hazard wire, and cut the yellow and white rear-turn wires off the dash-switch connectors to stop back-feed.
  6. Ignition switch: red → B, brown → ACC, orange → IG, blue → ST.

⚠ Caution

  • Keep the battery disconnected whenever you work on fuel or electrical systems.

Builder tips

  • Check every connector for color continuity across the plug. Mis-pins have been found in 2016, 2022, the Mk5 betas and a 2026 Mk5.
  • Wire before the body goes on. Fuse panel first, then center, front and rear sections.
  • Use cross-linked (TXL/GXL) wire and relays for fans and pumps. Fuse each circuit ahead of its relay.

Tools

  • Crimpers
  • Multimeter and test light

Step 39: Trunk aluminum

⏱ 4–6 hModerate📖 Manual pp.284–287
Rotate in 3D →

Parts for this step

Instructions

  1. Trunk sides, then the lower floor (not along the rear tube yet), then the front floor.
  2. Install the U-nuts for the rear quick jacks.
  3. Jack-support the tank and pull the right rear strap bolt; fit the rear floor; refit the bolt.
  4. Fit the strap patch panel. The stock patch may not fit the Mk5; make one if needed.
  5. Hold off on the trunk recess box until after the driveshaft.

Builder tips

  • Line up the aluminum holes with the quick-jack nuts now. These locate the body later.

Chapter 9

Engine and transmission

Dress the engine, set it in, then mounts, battery and headers.

Step 40: Dress the engine

⏱ 4–6 hModerate📖 Manual pp.287–292; FFR Coyote install doc
Rotate in 3D →

On the bench

Instructions

  1. Install the engine and transmission as one unit, with the shifter, headers and power-steering pump removed.
  2. Coyote and 4.6 engines need a shallow rear-sump pan (FFR pan, 8 qt; Moroso 20570 is a common choice). Small blocks need a rear-sump pan too; front T-sumps hit the front frame braces.
  3. Flywheel, clutch and bellhousing. Check that an aluminum bellhousing clears the flywheel.
  4. Fit the Coyote mount spacers (in the FFR install kit) and the engine mounts. The engine ground strap goes on a right-side engine-mount bolt; grind the coating at the 5/16" ground hole on the right mount.
  5. Pushrod small blocks with J-pipes: fit the oil-filter relocator now, outlets forward, and drill its mounting holes before the engine goes in.

Torque

Flywheel to crank (FFR Coyote doc)80 lb-ft
Pressure plate35 lb-ft
Bellhousing to engine35 lb-ft
Transmission to bellhousing50 lb-ft
Oil-filter relocator fittings28 lb-ft max

Builder tips

  • Mk5 oil pan maximum depth is about 7.5".

Step 41: Lower in the engine and transmission

⏱ 4–6 hInvolved📖 Manual pp.292–295
Rotate in 3D →

Parts for this step

Instructions

  1. Radiator out, moving blankets in the bay. Raise the rear of the chassis (one Mk5 Coyote builder raised it about 1.5 ft) and chock the tires on 2×6 stacks.
  2. Lower slowly with the tailshaft above the rear crossmember. Use a good load leveler.
  3. Leave every mount bolt loose to align the locating pins, then tighten the mount nuts with the pins in the pads.
  4. Transmission mount: 1/2" × 1.25" carriage bolts. It normally sits above the frame tabs; flip it below for clearance. The Mk5 plate is reversible and usually needs a spacer for transmission angle.

⚠ Caution

  • Cheap load levelers bend. Never put any part of your body under a suspended engine.

Builder tips

  • Mk5 Coyote: expect about a finger’s width of clearance at the heads. Hang the driver-side header before the engine is fully down, and leave the alternator off until that header is on.
  • Slip bike inner tubes over the hoist chains to protect the engine.
  • You can shift the engine and transmission within their mount slots to center the side pipes in the body cutouts later.

Tools

  • Engine hoist and load leveler

Step 42: Battery tray and cable

⏱ 1.5 hEasy📖 Manual pp.296–301
Rotate in 3D →

Parts for this step

Instructions

  1. Assemble the tray: #8 screws stop the J-bolts spinning; battery terminals opposite the bent side; J-bolts up through the hold-down with 1/4" locknuts.
  2. From under the frame, with the bent side forward, lift the tray and battery onto the frame mount and bolt it with 5/16" × 3/4" button heads and flanged locknuts.
  3. Run the positive cable down the right 1.50" tube to the starter, held with 5/8" clamps and 3/16" rivets.

⚠ Caution

  • Do not connect the negative lead until all wiring on the car is finished.

Builder tips

  • The manual recommends a Group 96R battery (p.15; p.18 says Group 34). Rev 1O+ frames use a tray that drops out the bottom, which matters if you fit the brake booster.
  • Ford wants 4 AWG cable through a 250 A fuse to the Coyote PDB, the PCM battery feed hot at all times, and battery-to-chassis ground resistance under 0.1 Ω.

Step 43: Headers, fuel feed and throttle

⏱ 3–4 hModerate📖 Manual pp.302–311
Rotate in 3D →

Parts for this step

Instructions

  1. Bolt on the headers with threadlocker. (Small-block shorties swap side to side and 4.6 manifolds flip to put the collectors forward; the shorter J-pipe goes on the right.)
  2. Connect the fuel line to the engine with slack for engine movement.
  3. Clutch: route the cable clear of the headers and steering shaft and adjust for zero play, or plumb and bleed the hydraulic clutch.
  4. Coyote: mount the control-pack PCM close to the engine (one builder put it on the frame just ahead of the RH footbox). The PDB must be within 60" of the battery. Install the drive-by-wire pedal and wire per the Ford and FFR Coyote instructions.

Builder tips

  • Coyote heads changed thread pitch during production (M10 × 1.5 vs M10 × 1.25). Start every header bolt by hand.
  • Remove the stock header studs first and use a stubby socket on the header bolts.

Tools

  • Sockets and wrenches
  • Threadlocker

Chapter 10

Cooling

Radiator, fan, hoses and overflow tank.

Step 44: Fan and radiator

⏱ 2 hEasy📖 Manual pp.312–320, 349
Rotate in 3D →

Parts for this step

Instructions

  1. Fan to radiator: wires toward the bottom; drill 3/16" through the flange and fasten with #10 × 5/8" screws from inside the flange.
  2. Lay 30" of half-moon weatherstrip under the top bracket. Slide the radiator over the frame’s lower mount.
  3. Top bracket tab forward against the flange, 5/16" × 3/4" carriage bolts inside-out. Drill 1/4" and fit 1/4" × 5/8" button heads through the flange, plus two 1/4" × 1.25" screws at the lower corners.
  4. Horns stack on the upper radiator mount, trumpets angled slightly down.

Builder tips

  • Upper flange heights vary between Mk5 radiators. Several builders skipped the top bolts and cushioned the lower mount.
  • Ground the radiator. It sits on rubber with rubber hoses.

Step 45: Hoses, overflow tank and fan control

⏱ 3 hModerate📖 Manual pp.320–330
Rotate in 3D →

Parts for this step

Instructions

  1. Fit the reducers inside the adapters. Upper hose: start at the engine and put the in-line filler as high and accessible as possible. Mark, cut, deburr and blow out the stainless tube.
  2. Lower hose: route under the steering rack with enough slack to move the radiator for the nose aluminum. Zip-tie it so it doesn’t hang.
  3. Overflow tank: visible and accessible; its hose goes to the tank’s bottom tube.
  4. Fan control: the 185°F thermostatic switch grounds the fan relay (off around 150°F), or let the PCM run it (Coyote: on at 195°F, off at 190°F).

Builder tips

  • Watch for high points. The A/C kit’s heater valve on the passenger footbox can become the system’s highest point and trap air.
  • A fan running at key-on usually means an unplugged or bad coolant-temp sensor.

Chapter 11

Driveline and tunnel

Driveshaft and the last chassis aluminum.

Step 46: Speedometer sender and driveshaft

⏱ 1.5 hEasy📖 Manual pp.330–336
Rotate in 3D →

Parts for this step

Instructions

  1. Fit the speedometer sender (or use a GPS speedometer, which needs no transmission signal).
  2. IRS: bolt FFR’s adapter to the pinion flange with six M10 × 25 socket-head screws and Loctite (apply the e-brake to hold it), tightening in a star pattern.
  3. Insert the driveshaft into the transmission and bolt its rear flange to the adapter.

Torque

Driveshaft to pinion yoke (solid axle)70 lb-ft, threadlocker
IRS adapter to pinion flange (M10 × 25, star pattern)41 lb-ft
IRS driveshaft to adapter70 lb-ft

Builder tips

  • Set ride height before you measure pinion angle. A high rear inflates the reading.
  • Zero your angle finder on the crank pulley, then read the pinion flange.

Step 47: Tunnel and remaining aluminum

⏱ 6–8 hModerate📖 Manual pp.337–345
Rotate in 3D →

Parts for this step

Instructions

  1. Tunnel rear corners, then the U-joint cover.
  2. Bleed the hydraulic clutch before closing up the tunnel front corners.
  3. Front top cover, tunnel top and shifter-hole cover.
  4. Left and right footbox outer walls. These can wait until after insulation and carpet if the body is going away for paint.
  5. Trunk recess box: move the harness aside, silicone without riveting, drop it in, then rivet the flange and the box seams.

Builder tips

  • Make the tunnel tops removable. Mk5 aftermarket split covers exist if you want easier access.
  • If the shifter and e-brake trim rings overlap, move the TKX shifter to its forward position or flip the shifter tower.

Chapter 12

Go-kart stage

Wheels, seats, roll bar, first fire and the first drive.

Step 48: Mount wheels and tires

⏱ 1 hEasy📖 Manual p.368
Rotate in 3D →

Parts for this step

Instructions

  1. Install the wheels and torque the lug nuts in a star pattern.
  2. Check that each wheel turns freely with no caliper contact.
  3. Set tire pressures.

Torque

Lug nuts90 lb-ft

Builder tips

  • Rear wheels up to 10.5" wide on the 3-link; fronts 7–9".
  • Check tire date codes when they arrive.

Step 49: Seats, belts and steering wheel

⏱ 3 hEasy📖 Manual pp.346–357
Rotate in 3D →

Parts for this step

Instructions

  1. Sit in each seat to position it, mark the rails over the seat mounting plates and drill 5/16" (5/16-18 × 1.5" hardware).
  2. Bolt in the harness for the driver. You will wear it at the go-kart stage.
  3. Steering wheel: six M6 × 30 screws to the boss (the pattern is asymmetric), then the 3/8" × 1" socket head to the shaft with threadlocker. Set the upper bearing collar set screws last.

Builder tips

  • The Mk5 floor is 2.5" lower. Average-height drivers often need 1¼–2.5" seat risers (Breeze 70815 or custom).
  • Rivet the serial-number plate to the hoop or a footbox top now (p.348).

Step 50: Fit and drill the roll bar

⏱ 2 hModerate📖 Manual pp.358–362
Rotate in 3D →

Parts for this step

Instructions

  1. Slide the rear leg on, then the hoop. Clamp the leg flush.
  2. Step-drill 1/8", 3/16", then 5/16" for 5/16" × 2" button heads: top of the rear leg first, then the front lower mounts, then the rear-leg lower hole last. Leave a bolt in each hole as you go.

Builder tips

  • Mk5 roll bars differ from Mk4 bars (hoop about 22" vs 24"; rear leg 21" vs 23"). Trimming 1–2" off the straight bar lets it seat first.
  • For track inspection, through-bolt or drill and tap two short button heads 180° apart.

Step 51: Fluids, grease and rattle patrol

⏱ 4–6 hModerate📖 Manual pp.368–374; Appendix C, D
Rotate in 3D →

Parts for this step

Instructions

  1. Rear axle: fill to the plug. Transmission: fill (TKX about 2.64–2.7 qt) and fit the shifter.
  2. Engine oil (Coyote with FFR pan: 8 qt 5W-20; 302: 5 qt 10W-30) and coolant (about 2 gal concentrate, 50/50).
  3. Grease every zerk.
  4. Rattle patrol: work through the Appendix C race-car checklist. Every fastener, every cotter, every line clip.
  5. Side pipes can go on temporarily now.

Builder tips

  • Burping a Coyote: remove the top bypass cap left of the throttle body until coolant rises, recap, fill the overflow, run to 195–200°F, cool fully, top up.
  • For small blocks, pulling the temp sender from the intake and filling until coolant reaches the bung is the builders’ trick.

Step 52: First start and go-kart drive

⏱ 4 hModerate📖 Manual pp.368–374
Rotate in 3D →

Instructions

  1. Connect the negative battery cable last. Check fuel pressure and look for leaks with the key on before cranking.
  2. Start the engine and warm it fully. Check for leaks of all five fluids, confirm the fan runs, and retighten the coolant hose clamps while warm.
  3. Drive in a small lot with the harness bolted in and worn. Check steering set screws, suspension binding, wiring near heat, gauges, and a brake pedal that doesn’t bottom.
  4. Set brake bias so the fronts lock just before the rears. Adjust pedal heights with the pushrods (small changes give large effects).

⚠ Caution

  • Go-kart crashes have happened from stomping the throttle in 2nd gear. No traction aids, short wheelbase, lots of torque: drive gently on cold tires.
  • Get liability insurance before you drive.

Builder tips

  • After the first heat cycles, re-snug the header bolts and listen for exhaust leaks with a hose held to your ear.

Chapter 13

Body fitting

Mount, center and fit every body panel before paint.

Step 53: Prep the frame for the body

⏱ 2 hEasy📖 Manual p.376
Rotate in 3D →

Instructions

  1. Remove the roll bar and the side pipes (split the exhaust at the 4-bolt flange).
  2. Install push-on bulb seal (#10761) across the top of the firewall, around the windshield mounts, and across the trunk walls and rear floor. Do this even for a test fit; seal compression sets the body’s position.
  3. Mk5: also run bulb seal across the arch of the rear cockpit wall (the manual omits this).
  4. Remove the internal spacers from the rear quick jacks for mock-up.

Builder tips

  • Fit the body without the side pipes. Pre-cut pipe openings are often inaccurate; trim them later with the body in its correct position.

Step 54: Mount and center the body

⏱ 6–10 hInvolved📖 Manual pp.377–386
Rotate in 3D →

Parts for this step

Instructions

  1. With 2–4 people and a 2×4 brace taped across the cockpit, lift the body on. Lift the rear higher than the front so the fenders clear the tires.
  2. Rear quick-jack mounts are the master locators (fore/aft, height, side-to-side). Long sleeves between body and chassis with washers at both ends. Wrap bolt ends in rags and tape for test fits.
  3. Sides: jack the lower edge up to the frame mount. The body must clear the dash-tube corners (bend the thin tube down if needed). Drill 1/4" and use 1/4" × 0.75" button heads with locknuts.
  4. Nose: center it by measuring each front wheel-well lip to the rear plate of the front coil-over bracket. Drill three 1/4" holes up through the nose and tube for 1/4" × 2" button heads.
  5. Engine-bay supports: bracket behind each hood-hinge mount, #10 countersunk screw through the hood-opening recess.

Builder tips

  • Aim for the rear of the door opening about 3/16–1/4" ahead of the door-latch area. If the body won’t come forward, trim 1/4–1/2" off the lower trunk-floor aluminum.
  • Record your centering measurements on tape stuck to the hood-opening lip. Re-centering on later fits gets faster.
  • Chase powder coat out of the quick-jack nuts and bolts before you start.

Step 55: Fit the hood and scoop

⏱ 6–10 hInvolved📖 Manual pp.387–415
Rotate in 3D →

Parts for this step

Instructions

  1. Sand or file the hood until it just sits in its opening. Rubber bumpers set its plane: try small, then large; shave or shim with washers; rivet them with long 1/8" rivets.
  2. Hinges (forward-opening): rivet the pivots into the pre-drilled liner holes (only a few rivets for now). Press the bronze bushings into the arms; 3/8" shoulder bolts with wave washers; carriage bolts to the chassis stay loose until aligned. Gas struts mount on ball studs.
  3. Weight the hood (an alternator works), center it by eye, then run a marker along the edge so it rubs the body lip and sand until the line is gone. Target about 3/16" gaps before paint.
  4. L-handles: 12" each side of center at the trailing edge (13" if the corners stand proud). Drill up to 5/8" step-wise, running large bits in reverse.
  5. Scoop: the opening sits 19" back from the hood’s front edge (Rev 1Q); rivet line 0.25" in, every 3" on straights and 2.5" around the curve. Cut the opening 1" inside the scoop flange.

⚠ Caution

  • Fiberglass dust: cut and sand outdoors with a P100 respirator, eye protection and covered skin.

Builder tips

  • Center the body at the nose instead of moving the hood hinge brackets.
  • The Mk5 has no tube support around the hood opening. Builders added light braces from the hood lip to the chassis where the surround sagged.
  • One builder’s manual gave 16" for the scoop. Verify on your car before cutting.
  • Coyote and Cobra Jet intakes come within about 1/4" of the hood; the scoop opening clears them.

Step 56: Windshield and inside mirror

⏱ 3 hModerate📖 Manual pp.416–424
Rotate in 3D →

Parts for this step

Instructions

  1. Set the windshield angle so the center of the top side-bar screw is 27" from the inside corner of the door opening.
  2. Mark, then drill the arms 1/2" and trim their ends (one builder trimmed 5").
  3. Fill any space between arm and bracket with washers.
  4. Inside mirror: on the dash frame flat, 1.4375" from the front of the tube. Drill 1/16", then 1/8" into the mount, then 3/16" through the body only.

⚠ Caution

  • Never pull the windshield arms in to the brackets. It cracks the glass.

Builder tips

  • The brass side-bar screw strips strip easily; stainless replacements exist.
  • Keep the windshield bolted down while fitting the doors. It changes the body’s shape.

Step 57: Hang and gap the doors

⏱ 8–12 hInvolved📖 Manual pp.425–430
Rotate in 3D →

Parts for this step

Instructions

  1. Install the windshield, inside mirror and trunk-side aluminum with bulb seal first; they push the body out.
  2. Trim each door only enough to fit and hang it on the hinge studs (U-nuts on the Mk5, so one hex key does it).
  3. Align from the top of the door first, matching the curved surfaces. Start with the body pulled in; add washers behind the body if needed.
  4. Set gaps with the marker method, about 3/16" before paint.
  5. Latch: fit the release lever and sandwich the stainless cover between latch and door frame. Leave latch and striker snug so both can slide.

Builder tips

  • A thick 3/8" washer between door and hinge on the lower front stud twists the door. It fixed a proud lower trailing edge for one builder.
  • Use plain nuts on the hinge studs while fitting; save the acorn nuts for final.
  • Trim the unused latch tab so the cover clears, and swap the hex-head latch screws for low-profile truss heads.
  • Check straps as drawn open the door only about 12"; plan a bracket to move the pickup outboard.

Step 58: Trunk lid and latch

⏱ 3 hModerate📖 Manual pp.363–364, 431–440
Rotate in 3D →

Parts for this step

Instructions

  1. Press the bushings into the hinge arms, leave the carriage bolts snug and hang the arms on the shoulder bolts.
  2. Trim the lid to just fit. Mount it to the hinge pads loose, close and wiggle it into place, then open and tighten.
  3. Latch: short #14 screws. Locate the pin from the latch-sleeve height and a gap line drawn on the body, drill 3/16" through the body and transfer to the chassis plate.

Builder tips

  • Once fitted, remove and refit the lid only by its four screws into the nutserts. Never touch the hinge-arm bolts again.
  • You can’t judge the lid’s fit until the seal is on.

Step 59: Cut the body openings

⏱ 6–8 hModerate📖 Manual pp.447–466
Rotate in 3D →

Parts for this step

Instructions

  1. Fuel filler: Appendix template, 3-1/2" hole saw, 1/8" flange screw holes, one 7/32" hole for the ground strap. Place the cap so it clears the body when open.
  2. Tail lights: gasket as a guide, 7/32" stud holes, 1/2" wire hole. Front turn signals: trace the gasket, 7/32" holes, 1-1/4" hole saw.
  3. License light: template (verify its printed scale first). Headlights: template centered and level, 1/4" then 3/8" corner holes, jig saw, 1/8" bucket screw holes.
  4. Side exhaust: pre-traced, 2-1/2" hole saw at the upper corners, jig saw the rest. Louvers: 1-1/4" hole saw at the corners.
  5. Roll bar: 1-3/4" hole saw. Front two holes vertical; the rear leg is a first cut at 45° stopped halfway, then finished vertically.

Builder tips

  • If the body hits the headers, remove the side pipes, not the body, and trim with the body in its correct place.
  • Cut louver openings about 1/16" undersize and match the fin angles.

Tools

  • Hole saws
  • Jig saw / air saw
  • Respirator

Chapter 14

Paint

Final prep, body off, paint and stripes.

Step 60: Final prep and body off

⏱ 8–12 hModerate📖 Manual pp.467–469
Rotate in 3D →

Instructions

  1. With windshield and side exhaust mounted (they fix the body’s shape), make every opening flange an even width and lightly radius all visible edges. Wheel-well flange about 3/8" wide.
  2. Mark the door and trunk hinge positions.
  3. Remove trim, then lift the body off onto its buck. Many painters want the panels mounted on stands with final gaps.

Builder tips

  • FFR’s painter says more than 40 hours of bodywork is unnecessary on the Mk5 body.
  • Body-off time is when the interior goes in: insulation and carpet are next.

Step 61: Paint and stripes

⏱ shop: 2–12 weeksInvolved📖 Manual pp.446, 469
Rotate in 3D →

On the bench

Instructions

  1. Remove mold-release wax with wax remover before anything else. The primer gelcoat sands easily.
  2. Typical shop sequence: grind parting lines, filler, DA, polyester primer, block with 150, urethane primer, block with 320 and guide coat, wet-sand 600.
  3. Let repairs cure for several days in sun or heat before final paint.
  4. Stripes: lay them out with all panels mounted, using the manual’s centerline references (headlight radius, oil-cooler hole, inside mirror, trunk-latch hole). They must look straight, not measure straight.
  5. Spray every panel in one session if you can, in its installed orientation, with the same number of clear coats.

Builder tips

  • Paint jobs ran $7,000–10,000 in 2023 forum reports; DIY materials about $900–1,000.
  • There are no official Shelby stripe dimensions. One painter’s method: string between license-lamp center and the headlight center, 1/2" each side for a 1" body-color gap.
  • Optional now: coat the body’s underside with U-Pol Raptor or bed liner.

Chapter 15

Interior (body at paint)

Manual Ch. 5 opens here: “With the body at paint, the interior of the car can get worked on.” Insulation, carpet, harnesses and final seat install go in before the painted body returns.

Step 62: Heat and sound insulation

⏱ 6–10 hEasy
Rotate in 3D →

Parts for this step

Instructions

  1. Do this while the body is away at paint. The manual sequences carpet, harnesses and the final seat install between Body Painting (p.469) and Final Body Mounting (p.509); insulation goes down first, under the carpet.
  2. Clean the aluminum. Start with the footbox walls that face the headers, the firewall and the tunnel.
  3. Roll mats down firmly with a brayer.
  4. Seal every gap between footbox and body; most footbox heat is radiant.

Builder tips

  • Fixes in order of payoff: seal gaps, ceramic-coat the headers, add reflective barrier (or polished aluminum on standoffs) on the engine side of the footbox, then insulation under carpet.
  • Products builders used: Second Skin, Dynamat (about 3 boxes), Thermo-Tec, DEI Reflect-A-Gold, Lizard Skin.

Step 63: Carpet

⏱ 10–16 hModerate📖 Manual pp.471–482
Rotate in 3D →

Parts for this step

Instructions

  1. Box 11 has 36 pieces. Glue with 3M Super 77/90 after an acetone wipe; silicone any open seams and harness slots first. Test-fit each piece.
  2. Order: rear wall, rear corners, tunnel (U-joint cover, top with shifter and e-brake openings, front), RH footbox inside/front/outside, LH outer, lower floors, under-door pieces, floors, trunk.
  3. Touch up over-trimmed spots with flat black paint.

Builder tips

  • Mount the side pipes before the floor carpet if you want their bolts hidden.

Step 64: Seats, harnesses and boots

⏱ 4 hEasy📖 Manual pp.483–494
Rotate in 3D →

Parts for this step

Instructions

  1. Drill back up through the carpet at the seat holes and bolt the seats in.
  2. Lap belts: drill 1/2" into the tunnel and use 1/2" × 1.25" bolts with nylocks, inner nut inside the tunnel.
  3. Shoulder belts are side-specific: pass them through the rear wall with edge trim on the slot and a single slit in the carpet.
  4. Shifter handle bolts with threadlocker; mark and drill 1/8" for the boot screws. E-brake boot: four #8 × 3/4" oval heads.

Builder tips

  • With seat risers the 5-point anti-submarine strap may be too short.
  • Finalize seat position with the body on; seat backs can touch the body above the latches.

Chapter 16

Final assembly

Painted body on for good, lights, glass, dash and trim.

Step 65: Pre-mount parts on the painted body

⏱ 4 hEasy📖 Manual pp.495–500
Rotate in 3D →

On the bench

Instructions

  1. Headlights: adjuster screws halfway, bottom boss in from the side, trim ring.
  2. Turn signals and tail lights: don’t over-tighten.
  3. Gas cap: gasket and five countersunk screws; the longer screw takes the ground strap.
  4. Side louvers: polish, then bend the fins about 45°; silicone and tape them in.
  5. Weatherstrip, plus a small section of expanding foam up the outside of each footbox just ahead of the door hinge.

Step 66: Mount the painted body

⏱ 1 dayInvolved📖 Manual pp.500–515, 556–561
Rotate in 3D →

Parts for this step

Instructions

  1. With four people, work the sides down slowly and pull them out around the chassis. Make sure the body covers the rear cockpit wall and dash top without dragging off material.
  2. Fasten the quick jacks, then the nose screws.
  3. Radiator floor aluminum: silicone and rivets every 2", three 3/16" rivets to the nose lip.
  4. Splash guards: bulb seal on the edges, check tire clearance, rivet.

Builder tips

  • Slit 1/2" PEX tubing over the body edges and lay plastic sheet over the trunk sides to protect the bulb seal while lowering.

Step 67: Hood, roll bar, glass and doors

⏱ 1–2 daysModerate📖 Manual pp.515–530
Rotate in 3D →

Parts for this step

Instructions

  1. Rivet the hood scoop back on and reinstall the hood bumpers, latch plates and hood.
  2. Roll bar, with grommets first.
  3. Windshield base: trim the gasket off the glass wipe, 3/32" pilots, silicone the slot, #6 × 1/2" truss screws.
  4. Doors and latches; check straps with 3/16" rivets, the door opening just short of hitting the body.
  5. Fuel filler hose: cut a 5" section out; fit the static ground strap.
  6. Silicone the fuel-sender access covers. Trunk: side weatherstrip, latch pin, license light.

⚠ Caution

  • The fuel-filler ground strap is mandatory. It prevents static discharge at the pump.

Step 68: Dash and gauges

⏱ 6–8 hModerate📖 Manual pp.533–551
Rotate in 3D →

Parts for this step

Instructions

  1. Open the gauge holes with tin snips. Cover the dash with 3M Super 77/90: 1" border, relief cuts every 2", openings cut 1/8" inside the aluminum, a “+” at the column hole, ends bent 1.25" in at 45°.
  2. Install after the body: rivet the supports to the tunnel cover, then three screws to the hoop (1/8" pilot through dash and chassis, 3/16" through the dash only). The ends tuck behind the top of the door hinges.
  3. Wire the gauges. Coyote tach needs an adapter; mount the water-temp sender in the block port and the oil-pressure sender on a tee at the filter adapter.

Builder tips

  • Don’t use hook-and-loop; the adhesive fails in heat.
  • Leave the center dash fastener out until after paint and stripes. The center is never where you think.
  • Confirm dash height with the body on, or the wings will hit the body.

Step 69: Light wiring and trim

⏱ 4 hModerate📖 Manual pp.525–532
Rotate in 3D →

Parts for this step

Instructions

  1. Headlight: black = ground, white = high, red = low. The high/low switch is mandatory.
  2. Front turn lamp: black → black; green → dark green (L) / light blue (R); yellow (running) → tan.
  3. Tail lamp: white (ground) → black; red (stop/turn) → yellow (L) / white (R); black (tail) → tan.
  4. Under-door aluminum: weatherstrip, silicone and rivets, then large C-channel trim from hinge to latch, barb side inward.
  5. Grille, over-riders and emblems (cut the emblem pins off; use 3M molding tape).

Builder tips

  • With the column turn-signal switch, the tail-light converter is not used. The manual text is internally inconsistent here; follow the harness instructions.
  • Some states require wipers and washers at inspection.

Step 70: Steering wheel center and side exhaust

⏱ 3 hModerate📖 Manual pp.551–556
Rotate in 3D →

Parts for this step

Instructions

  1. Steering wheel center: a little WD-40 on the O-ring. Tighten the upper bearing collar set screws now.
  2. Side pipes: cut the rubber hanger above its bracket. Bolt pipe and gasket to the header flange with 3/8" × 1.25" socket heads.
  3. Drill 5/16" up through the frame-mount bracket holes, frame plate and floor; 1" button heads from inside the cockpit.
  4. Set the pipes level and parallel to the body.

Builder tips

  • No stainless fasteners at the header joint (they gall). Use plated socket heads, serrated washers and deep brass nuts with high-temp anti-seize; split lock washers do nothing.
  • Fit side-pipe heat shields, especially on the passenger side, and crank the straps tight.

Chapter 17

Road ready

Ride height, alignment, brakes, checks and paperwork.

Step 71: Ride height and corner balance

⏱ 3 hModerate📖 Manual p.562
Rotate in 3D →

Instructions

  1. Load the car as driven (driver, passenger weight, fuel). Disconnect the sway bar and roll the car to settle it.
  2. Set 4.5" front and rear. The manual measures to “the bottom of the 4" round tube,” wording carried over from the Mk4; on the Mk5 measure at the main frame rails and confirm the point with FFR tech.
  3. Adjust both sides equally. Set about 1/2" high at first; it settles.
  4. IRS: align the rear at ride height: camber −0.5° to −0.75°, total toe 1/8" in.

Builder tips

  • A common street rake is about 4" front, 4.5" rear. One Mk5 at 3¼" front dragged its side-pipe hangers.
  • Corner balance on a flat floor: raise a corner’s collar to add weight there. Equal side-to-side adjustments typically land within about 5%.

Step 72: Alignment and headlight aim

⏱ 2 h + shopModerate📖 Manual pp.561–564
Rotate in 3D →

Instructions

  1. Manual rack: caster 3°, camber −0.5°, total toe 1/16". Power steering: caster 7°, same camber and toe.
  2. Loosen the UCA pivot bolts during alignment and retorque after. Never more than 1" of thread past a jam nut.
  3. Headlights: wall 25 ft away. Horizontal line 2" below lens-center height; put the low-beam cutoff on the line.
  4. Re-apply torque-stripe witness marks after alignment.

Torque

UCA pivot bolts after alignment54–60 lb-ft (manual pages differ)

Builder tips

  • Darty power steering: add caster (7–8°), toe-in rather than out, and run 22–23 psi.
  • IRS rear: camber −0.5° to −0.75°, total toe 1/8" in; Loctite the large UCA jam nut after.

Step 73: Brake test and pad bedding

⏱ 1 hEasy📖 Manual p.565
Rotate in 3D →

Instructions

  1. The pedal must hold firm for several minutes without sinking.
  2. At 2–5 mph, brake hard through full lock both ways; pull the wheels and inspect. Then moderate and hard stops from 15–20 mph.
  3. Bed the pads: light on/off cycles (about 5 seconds on, 10 off), then medium stops, then 8–10 hard stops from 55–65 mph down to 25 mph.
  4. Cool-down drive without holding the brakes at a stop, then park until cold.

Step 74: Nut-and-bolt check

⏱ 4 hEasy📖 Manual p.583, Appendix C
Rotate in 3D →

Instructions

  1. Use the Appendix C race-car check sheet: steering, front suspension, brakes, cockpit, electrical, rear, transmission, engine.
  2. Witness-mark critical fasteners with torque paint (ball joints, axle and driveshaft bolts, lug nuts).
  3. Re-check after the first drives and repeat yearly or before track days.

Step 76: Shakedown and break-in

⏱ 500 miEasy
Rotate in 3D →

Instructions

  1. Follow your engine supplier’s break-in. Ford’s Mustang guidance quoted by builders: 100 miles before wide-open throttle, 1,000 before performance use.
  2. Re-check fluids, hose clamps, header bolts and lug nuts after the first drives.
  3. Learn the car gradually: cold or wet tires and a new tune have caused crashes. An autocross or car-control class is the best upgrade you can buy.

Builder tips

  • Fire extinguisher: a clean-agent type (Halotron or similar) mounted where you can reach it belted in. Dry chemical ruins paint and electrics.