All steps
Section 2 · Front Suspension
Step18/21
Mount the spindles to the lower ball joints
~30 min3/5
Status
You're in demo mode. Create an account to mark steps complete, save notes, and upload photos.
The DSS / PSS stamps are deceiving on the Roadster. If you read them at face value and bolt the to the stamped side, you have it backwards. Right side = DSS-stamped ; left side = PSS-stamped .
Tools you'll use
- 13/16" socket
- torque wrench
- needle nose pliers
- rubber mallet
Parts from your kit
- spindle assembly (Box 21): spindle, hub, hub nut, dust cover
- countersunk spacer (FFR part 15803)
- cotter pin
What to do0 / 4 checked
Spec sheet
- Lower ball joint castle nutAlign the slot with the cross-hole in the stud and install the cotter pin.80-90 lb-ft (108-122 Nm)